Make the project requirements visible in production.
Drawing revision, material documentation, inspection scope and component identification should be defined before manufacturing starts.

Traceability begins with the approved drawing.
ELCRIS can maintain project identification and manufacturing documentation according to the agreed purchase requirements. The exact scope is defined during technical review, not assumed after production.
Drawing & revision control
Manufacturing references the approved project documentation.
Material documentation
Required certificates and material records are agreed at RFQ stage.
Inspection planning
Dimensional, visual, NDT or third-party requirements can be included where specified.
Component marking
Project and part identification can be maintained through production and dispatch.
Machined interfaces, marking and finish.
Quality is easiest to discuss when the drawing defines measurable requirements and the inspection scope is included in the enquiry.

Machined geometry
Critical interfaces can be machined and checked as part of the manufacturing route.

Surface & bore finish
Finished bores and mounting interfaces prepared to the project requirement.

Visible workmanship
Surface condition and finishing can be documented where the project requires it.

Part identification
Project-specific marking provides a direct link between the finished component, drawing and order documentation.
Send the quality requirements with the drawing.
That gives us the best basis for a realistic technical route and commercial quotation.